*IMPORTANT NOTE*
THIS PROCEDURE APPLIES TO SPECTRA CONNECT VENTURA SYSTEMS ONLY
Boosting Pressure (During Chemical Purge or Filter Calibration)
During a chemical purge cycle and/or filter calibration, it is possible for a Ventura system to get hung up on a ‘Boosting Pressure’ screen. This may not happen every time, depending on the system’s relationship to the waterline and positive pressure.
See below for steps to quickly advance past this screen:
- Flip the toggle switch on the Connect control box to Run Manual
- Once the boost pressure reaches 15psi, the screen will advance
- You can then move the toggle switch back to the Auto position and continue following the prompts on the Spectra Connect and use your system normally.