*IMPORTANT NOTE* 

THIS PROCEDURE APPLIES TO SPECTRA CONNECT VENTURA SYSTEMS ONLY

 

Boosting Pressure (During Chemical Purge or Filter Calibration)

 

During a chemical purge cycle and/or filter calibration, it is possible for a Ventura system to get hung up on a ‘Boosting Pressure’ screen. This may not happen every time, depending on the system’s relationship to the waterline and positive pressure.

 

See below for steps to quickly advance past this screen:

  1. Flip the toggle switch on the Connect control box to Run Manual
  2. Once the boost pressure reaches 15psi, the screen will advance
  3. You can then move the toggle switch back to the Auto position and continue following the prompts on the Spectra Connect and use your system normally.